It’s still a work in progress for a large architecture firm, but it allows smaller firms to deliver projects in BIM. I think it’s one of the most important projects in the AEC world.
Thank you
If I may suggest, I would add:
Worksharing
Dynamic LOD
A better interface when creating/editing elements such as walls
A simplified interface to minimize confusion with Blender
Working directly in 2D (as a designer does) while automatically generating the 3D model
The work done is exceptional!!!!!
It’s still a work in progress for a large architecture firm, but it allows smaller firms to deliver projects in BIM. I think it’s one of the most important projects in the AEC world.
Thank you
If I may suggest, I would add: Worksharing Dynamic LOD A better interface when creating/editing elements such as walls A simplified interface to minimize confusion with Blender Working directly in 2D (as a designer does) while automatically generating the 3D model